Elk Lake Lodge Septic System 
Location: North Hudson, NY

Project Description: Cedarwood was contracted to complete design of a new septic system for the Elk Lake Lodge located in North Hudson, New York.  Design staff completed test pit evaluations and percolation tests to design a new septic system to replace the existing antiquated system for the lodge with close coordination with the Owner and Owner's representative.  Final design was approved by the Department of Health in October of 2019.  The project was bid following approval, and construction commenced in late October with final restoration completed in the spring of 2020.

 

Contractor: MCJ Construction LLC

 

Construction Cost: +/- $260,000

 

Project Status: Completed in spring of 2020.

2018 - Cedarwood Engineering (22) (GREEN

© 2019 Cedarwood Engineering & Environmental Services, PLLC

Contact Us:

Warrensburg Office:

Phone: (518)-623-5500

Fax: (518)-623-5503 

3903 Main St

Warrensburg, NY 12885

Oneonta Office:

Phone: (607)-441-3246

Fax: (607)-441-3251

8-12 Dietz St, Suite 302

Oneonta, NY 13820