top of page

Lake George Escape Campground Wetland Restoration & Culvert Project

Cedarwood was contracted by Equity Lifestyle Properties, Inc. to provide engineering and permitting services for a wetland remediation and shoreline protection plan for the Lake George Escape Camping Resort. The project was designed in accordance with the Adirondack Park Agency, New York State Department of Environmental Conservation and United States Army Corps of Engineers regulations. Various wetland areas around the park were restored along with incorporating elements from the wetland remediation plan, shoreline protection plan, viewshed protection plan along with construction of bottomless arch culverts. A stormwater pollution prevention plan for erosion and sediment controls was also completed in accordance with NYS DEC regulations and inspections completed by Cedarwood throughout the duration of construction.


Contractor(s): Patrick J. Galusha Construction, LLC

Funding Agencies: Private

Project Status: Completed in 2021

Project Gallery

2018 - Cedarwood Engineering (22) (GREEN

© 2019 Cedarwood Engineering & Environmental Services

Saratoga Springs Office:

Phone: (518)-623-5500

625 Maple Ave., Unit 2

Saratoga Springs, NY 12866

Contact Us:

Warrensburg Office:

Phone: (518)-504-4096

89 River St. 2nd Floor North Unit 2

Warrensburg, NY 12885

Oneonta Office:

Phone: (607)-441-3246

Fax: (607)-441-3251

464 Main St, P.O. 1360

Oneonta, NY 13820

bottom of page