Stony Creek Pedestrian Bridge

The Town owns designated park land on both sides of Stony Creek and with the installation of a prefabricated wooden bridge it allowed access to connect the parking lot, ballfields and restrooms into the existing recreational Dean Farm trail system. This design incorporates a prefabricated wooden bridge set on poured reinforced concrete abutments. The bridge is ADA compliant and is accessible with approach walkways consisting of compacted earth with a fine gravel topping, all held in place with large natural stone retaining walls. The wooden bridge with the natural stone was selected to fit within the natural beauty of the park.


Project Cost: $228,000

Contractor(s): Stephen Miller General Contractors, Inc.

Project Status: Completed in 2021

Project Gallery

2018 - Cedarwood Engineering (22) (GREEN

© 2019 Cedarwood Engineering & Environmental Services

Saratoga Springs Office:

Phone: (518)-623-5500

625 Maple Ave., Unit 2

Saratoga Springs, NY 12866

Contact Us:

Warrensburg Office:

Phone: (518)-504-4096

89 River St. 2nd Floor North Unit 2

Warrensburg, NY 12885

Oneonta Office:

Phone: (607)-441-3246

Fax: (607)-441-3251

464 Main St, P.O. 1360

Oneonta, NY 13820

bottom of page